The dredge report sarasota magazine2/22/2024 In 1911, the Sarasota Times reported that Thomas planned to dredge around the key “throwing the dirt back among the mangroves to form a breakwater.” Once the island was enlarged and prepared, they ferried building material across the bay to construct what became known as New Edzell Castle, a lovely mansion and Sarasota show place. The 12.8-acre island, known as Bird Island, was purchased by Davie and Thomas Worcester in 1906 to be the site of their retirement home. One of the earliest examples was the first transformation of Bird Key. Her observation was particularly true of Sarasota, which, without the dredge and fill that has taken place over the years, would be all but unrecognizable, and, in some respects not as desirable. Dredging seems to be going on all the time, making more and more land.” She was quoted in the Herald, “The amount of made land here surprises me. Smith said, though, that at last report, 20 turtle nests have been marked in that area, which indicates that the beach is already suitable for nesting.When Eleanor Roosevelt traveled through Florida on her way to Sarasota for one of her annual visits, she marveled at the “made” land. Next week, the contractors plan to rake the northern part of the beach, so it will be soft enough for turtles to dig their nests. Mote Marine Laboratory and Sarasota Audubon Society are doing daily sea turtle and shorebird monitoring at the project site, according to the county. The northern section of the beach is open to the public. This week, the team is working its way southward along the beach, adding sand as it goes.Īs they travel southward, southern beach access points will be closed in approximately 500-foot sections, a Sarasota County spokesperson said. They deposit the sand in a large pile, and off-road trucks shift the sand to different parts of the beach.Ĭurtis Smith, the project manager, said the workers are done placing sand on the northern beach. Dump trucks are moving sand from a mine elsewhere in the state to Turtle Beach Park. The project, which began in late April, is meant to repair damage from Hurricane Hermine in 2016.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |